How are materials and lead times handled?
Materials are confirmed and ordered at stage 05, once the quote is accepted and before anything is demolished. Stone slabs, imported tile, specific door finishes and appliances all carry different lead times, so they are ordered against the drawing rather than reserved while the site waits. Selection detail sits on
Kitchen Benchtops and
Kitchen Splashbacks.
12
Do I have to replace the whole kitchen?
No. If the layout works and the carcasses are sound, a
kitchen makeover — new doors, benchtop, splashback and hardware — changes the room without touching the plan. If the layout is the problem but a full rebuild is not required,
kitchen remodelling reworks the joinery and zones within a tighter scope. The measure tells us which of the three is the sensible route.
13
Which suburbs do you work in?
Murrumbeena is the base, with work through Carnegie, Hughesdale, Oakleigh, Chadstone, Malvern East, Bentleigh East, Ormond and McKinnon. It is a tight radius on purpose — short runs between site, suppliers and trades make it straightforward to check a setout or return for an adjustment. See
Service Areas.
14
What does handover include?
Doors and drawers adjusted so gaps are even and fronts close cleanly, hardware and soft-close checked, silicone lines cut in, appliance documentation passed over, and a walk-through of the finished room against the quoted scope. Anything raised at that walk-through is written down and closed out — handover is the point where the kitchen becomes yours to use, not the point where the paperwork stops.